2023年困难
项目的更新
On-Lot 首页 Connections
All on-lot home connections have been completed.
道路修复
公共工程 will pave the roads in the project area after all the homeowners' on-lot connections have been made in Contracts B and C. They will pave the 合同维 area after the on-lot connections have been made in that area.
合同维
Arlington Court is 100% complete. The asphalting of road crossings is completed. Construction and landscaping of the vacuum station on Harbor Boulevard are completed. Construction staging areas will be at 157 and 159 Salem Ave, as well as 139 Francis Dr. A fence and privacy screen, will be placed on the perimeter of these properties. This project will be taken in multiple phases, starting with the streets on the east side of Harbor Boulevard, 在- - - - - -
- All the water mains will be installed
- The old water mains will be removed
- The new vacuum sewer mains will be installed
- Sewer service pits and laterals will be installed
- Storm drainage and crossings will be restored
- On-lot connections will take place at individual homes after the Vacuum Station on Harbor Boulevard has been completed, followed by sod restoration
- The roads will be re-paved by 公共工程 after the on-lot connections may have been made
For more information call 941.764.4300, Option 3 or email 行政.Assistants@CharlotteCountyFL.政府.
- Hardship 信 - May 25, 2023
- Hardship 信 - May 23, 2022
- Hardship 信 - May 6, 2021
- Hardship 信 - April 15, 2020
- Septic-to-Sewer Water Quality Review
- Hardship 信 - May 1, 2019
- Hardship 信 - July 10, 2018
- Hardship 信 - April 6, 2018
- Contract B - Final Phases Connection 信 - Dec. 7, 2017
- Contract C - Phase 1 Connection Postcard - Oct. 23, 2017
- Contract C - Phase 2 Connection 信 - Sept. 6, 2017
- Project Update for Commission - May 9, 2017
- 合同维 - Informational Presentation - 2月. 23, 2017
- 合同D -信件 & On-Lot Easement Form - 2月. 2, 2017
- Contract C - Phase 1 Connection 信 - 1月. 5, 2017
- Contract B - Phase 2 Connection 信 - 1月. 5, 2017
- Connection Phase 1 Notification 信
- Board Presentation Charlotte Harbor Water Quality Initiative (Includes Storm Water Quality 报告ing)
- Contract B - Final Survey
- 信 & Survey Sent to Properties in Contract B - Sept. 1, 2015
- 信 to Property Owners - July 9, 2015
- 信 & Survey Sent to Properties in Contract C - June 11, 2015
- Hardship 信 - July 10, 2018
- Hardship 信 - 2月. 15, 2017
- 困难信-三月. 7, 2016
- 困苦信-十二月. 17, 2014 | 分辨率2014 - 171
- Hardship 信 - 2月. 11, 2014 | 分辨率2014 - 109
- Final Resolution 2013-052
- Initial 分辨率2013 - 036
- Information 信 - Nov. 6, 2013 | 分辨率2013 - 036
- Assessment Roll Regular - Sept. 25, 2013
- Presentation to Commission - April 16, 2013
- Water Quality 报告 - June 27, 2013
- Information 信 - April 25, 2012 | 退税表格